UM Freshmen Village Phase IIA & IIB

Location Miami, Florida
Architect Zyscovich

Project Detail

The project consists of four new student housing buildings and the renovation of the existing Eaton Residential College. There is also extensive site work that includes lakeside boardwalk, retaining walls, dock, steps, and courtyards.

Phase IIA includes demolishing Walsh and Rosborough dorm buildings and replacing them with an 8-story and 10-story buildings (North of the Canal). There are multi-level elevated bridges that connect the new buildings.

Phase IIB includes demolishing McDonald and Pentland dorm buildings and replacing them with an 8-story and 10-story buildings (South of the Canal). The buildings and connecting bridges would be mirrored and similar to Phase IIA.

Total gross area of the new construction is approximately 447,500-sf.