Concourse
G
Miami International Airport
Replacement of existing Concourse G with new 295,000 sf International Concourse
"E"
Satellite Extension
Miami International Airport
Westward expansion of the existing Concourse E International Satellite, adding
11 new international gates in a 3-level, 377,000 sf facility refurbishment of
existing space, construction of chiller
plant
Concourse
"F" Phase 2
Miami International Airport
Replacement of south side of original concourse with 117,000 sf 3 level facility
with international capability
Concourse
"F" Connector
Miami International Airport
Foundation and column reinforcement & roof raising
Design
Guidelines Manual, Terminal Edition, Dade County Aviation Department
Miami International Airport
Revisions to the Design Guidelines Manual
incorporates revised wind loading criteria for all the facilities under the Dade
County Aviation Department
|
Lower
Vehicular Drive Refurbishment
Miami International Airport
Column strengthening and foundation underpinning from Concourse B to D and F
to H
Terminal
At Concourse "E"
Miami International Airport
Hotel atrium food court
Northwest
Area Improvements
Miami International Airport
General aviation facilities, customs, maintenance hangars and gate structure
36th
Street Aircraft Maintenance Facility
Miami International Airport
Aircraft parking apron and hardstand
aircraft washrack (designed), administration building, warehouse, multi purpose
building, executive hangar, maintenance hangar (design development), interim
hangar options (preliminary design), flight simulator facility
Aircraft
Hangar Buildings
Tamiami Airport
Three 13,000 sf hangars for small aircraft and helicopter operations
Design Guidelines
Manual, Cargo Building Edition
Dade County Aviation Department
Bartlett
Aviation Hangar
Opa Locka Airport |