George N. Khoury, P.E.
Senior Principal/Partner
George has designed structural systems for a variety of project types
ranging from parking garages, residential, educational facilities, healthcare,
and sports facilities, using cast-in-place concrete, composite
precast concrete, post-tensioned concrete, light gage steel, wood, and
structural steel systems. His diversified experience in structural engineering
analysis, design and management combined with his passion for excellence
and teaching make him perfectly suited for the role as engineering director.
He actively supervises all engineering projects and develops our firm’s
standards.
George has taken on the development of junior engineers as one of his
key responsibilities. Through in-house seminars and one-on-one mentoring
he shares freely of his knowledge. His extensive real world experience
on all issues related to production have facilitated his role as BNI’s
key person responsible for ensuring all projects are delivered on time
and meeting the highest standards.
George is a Florida Certified Special Inspector.
Education
BSCE, University of South Florida, May 1994
Major: Structural Engineering
Licensed Engineer
Florida
Memberships
American Institute of Steel Construction
Florida Structural Engineering Association.
Post Tensioning Institute
Precast Concrete Institute
National Council of Structural Engineers Association
Select Projects
TallahasseeMemorialHospital,
Tallahassee, Florida
- 653,000 square foot expansion to Florida’s eighth largest
hospital.
- Phase I includes a parking garage and the Bixler Emergency Center.
- Phase II consists of a Family Care unit, Women’s and Children’s
Center and a professional office building.
- Project Manager, Engineer of Record.
University of CentralFlorida,
Orlando, Florida
- 15,000 seat multipurpose arena
- Primary structural frame: cast-in-place concrete with a long span
structural steel roof.
- Project Manager
Jacksonville Sports and Entertainment Complex,
Jacksonville, Florida
- 15,000 seat multipurpose arena.
- Primary structural frame, cast-in-place concrete with a long span
structural steel roof.
- Project Manager.
Gillette Stadium, Foxborough,
Massachusetts
- 65,000 seat football stadium for the New England Patriots.
- Primary structural frame, structural steel.
- Design Engineer.
FloridaStateUniversity
Parking Garage No, 2. Tallahassee,
Florida
- The 850 car parking structure has 4-level of parking at the perimeter
and 3-level of scissors ramps parking at the middle section of the
building.
- The facility employs pre-topped double tees precast floor system
to offer a clean, aesthetically pleasing and functional structure.
- Project Manager, Engineer of Record.
FloridaStateUniversity,
Parking Garage No. 3. Tallahassee,
Florida
- 4 levels; 1,500 cars
- Principal in Charge
City of Hialeah Parking Garage,
Hialeah, Florida
- 5 levels; 365 cars.
- Project Manager, Engineer of Record