 |
Christopher S. Childers, P.E.
Associate Principal
Director – Tallahassee Office
Chris’ three decades of experience in structural engineering have spanned
design, fabrication, construction and inspections. He has been successfully managing
Bliss & Nyitray’s Tallahassee office since its opening in 1992. Prior
to joining Bliss & Nyitray, Inc., Mr. Childers worked as the Chief Engineer
for a major steel fabricator in Jacksonville, Florida and as a Project Manager
for a major plate steel design and fabrication firm in Birmingham, Alabama.
Drawing on the insights he has gained working for steel fabricators and as
a site representative and field engineer, Chris always considers constructability
when designing structural systems. His projects have utilized structural steel,
reinforced concrete, precast concrete, post-tensioned concrete, masonry and wood.
In addition to his extensive amount of work on educational facilities working
with Florida State University, Chris’ project experience includes
mixed use projects, residential, parking garages, sports facilities and office
buildings.
Chris is a Florida Certified Special Inspector.
Education
BSCE, University of Florida, 1982
Major: Civil Engineering
Florida
Georgia
Memberships
American Institute of Steel Construction
Select Projects
LeonCountySchools-FortBradenSchool Addition, Tallahassee, Florida
- 32,000 sq ft addition to the existing K-8 school including the addition of
a new gymnasium, locker rooms, and a new classroom wing.
- Primary structural frame, concrete masonry with structural steel beams and
steel open web roof joists.
- Project Manager, Engineer of Record
Leon County Schools – RobertsElementary
School, Tallahassee, Florida
- 90,000 sq ft new elementary school.
- Primary structural frame, concrete masonry with structural steel beams and
steel open web roof joists.
- Project Manager, Engineer of Record
Leon County Schools – AdultCommunityEducationSchool Addition, Tallahassee, Florida
- 13,500 sq ft addition to the existing school including the addition two new
classroom wings.
- Primary structural frame, concrete masonry with structural steel beams and
steel open web roof joists.
- Project Manager, Engineer of Record
Liberty County Schools – Bristol K-8
School, Bristol, Florida
- 86,200 sq ft new K-8 school including four independent buildings; administrative
wing, primary wing, middle wing and gymnasium.
- The primary wing is designed as a hurricane shelter.
- Primary structural frame, concrete masonry with structural steel beams and
light gage steel roof trusses.
- Project Manager, Engineer of Record
FloridaStateUniversityCommunicationsBuilding
- New facility and renovation of the north end zone of Doak Campbell Stadium
- Primary Structural Frame, cast-in-place concrete, with precast prestressed
composite concrete joists with cast-in-place concrete floors and structural steel
roof system with open web steel joists and steel corrugated roof deck.
- Project Manager, Engineer of Record, Threshold Inspector
FloridaA&MUniversity Coleman
Library Additions
- Addition of 47,000 GSF to the existing Coleman Library
- Primary Structural Frame, cast-in-place concrete, with precast prestressed
composite concrete joists with cast-in-place concrete floors and structural steel
roof system with open web steel joists and steel corrugated roof deck.
- Project Manager, Engineer of Record, Threshold Inspector
Florida State University Research Foundation Buildings
- 169,176 GSF research/office space in two buildings
- Primary Structural Frame, cast-in-place concrete, with precast prestressed
composite concrete joists with cast-in-place concrete floors and structural steel
roof system with open web steel joists and steel corrugated roof deck.
- Project Manager, Engineer of Record
FloridaStateUniversity Parking
Garage No. 3
- 1,500 space, 4 story parking garage for Florida State University, Tallahassee,
Florida
- Primary Structural Frame; deep pile foundations using augercast piles and
pile caps supporting precast concrete columns, beams, walls, double tees and
flat slabs.
- Principal in charge, Engineer of Record
FloridaStateUniversityJohnston Dining
Hall Renovation
- Renovation of an historic two story building on the Florida State University
Campus. The original building was constructed between 1914 and 1921 and consisted
of load bearing brick masonry walls wood floor system and wood kings post trusses.
- The renovation consisted of removing the existing second story wood floor
system and replacing it with a new concrete flat slab floor. We incorporated
the existing brick masonry walls and columns into our design.
- Project Manager, Engineer of Record
Florida State University West Dining Facility
- New one story dining hall for Florida State University.
- The structure consisted of shallow spread footings, load bearing masonry
walls, structural steel roof framing, light gage steel roof trusses, open web
steel roof joists and steel roof deck.
- Project Manager, Engineer of Record
FloridaStateUniversity Parking
Garage No. 4
- 1,000 space, 4 story parking garage
- Primary Structural Frame; deep pile foundations using augercast piles and
pile caps supporting precast concrete columns, beams, walls, double tees and
flat slabs.
- Principal in charge, Engineer of Record
FloridaStateUniversity Howser
Baseball Stadium Renovations
- Renovation and expansion of the existing stadium
- Including grandstand and bleachers, pressboxes, locker rooms and training
spaces, administrative spaces
- Primary Structural Frame, deep pile foundation system, precast prestressed
columns, beams, and single “L” bleacher seating units.
- Project Manager, Threshold Inspector, Engineer of Record
PressBoxTower Renovation
and Addition at Ben Hill Griffin Stadium, University of Florida, Gainesville, Florida
- 10,000 Seat Addition to North End Zone of the existing football stadium.
- Primary structural frame, cast-in-place concrete with precast prestressed
composite joists.
- Project Manager
Florida Commerce Credit Union
- New 3 story office and bank building
- Primary Structural Frame; concrete cast-in-place shallow spread footings,
load bearing masonry shear walls, structural steel columns, composite steel beams,
2" composite steel floor deck, 5 1/2" concrete elevated slabs, steel
open web roof joists, 1 1/2" steel roof deck
- Principal in Charge, Engineer of Record
Wakulla Bank – Crawford Main Bank
- New one story building adjoining an existing building and renovation of the
existing one and two story bank buildings.
- Primary Structural Frame; concrete spread footings supporting structural
steel roof framing with steel I beams, open web steel joists and corrugated steel
roof deck.
- Project Manager, Engineer of Record
SwissBankBuilding
- New three story building with mechanical mezzanine for Swiss Bank on Grand
Cayman Island
- Primary Structural Frame, cast-in-place concrete, with precast prestressed
composite concrete joists with cast-in-place concrete floors and pre-engineered
wood roof trusses with plywood roof deck.
- Design Engineer
GystBuilding
- New three story office building on Grand Cayman Island
- Primary Structural Frame, cast-in-place concrete, with precast prestressed
composite concrete joists with cast-in-place concrete floors and pre-engineered
wood trusses with open web steel joists and steel corrugated roof deck.
- Design Engineer
TallahasseeMemorialHospital Bixler
Emergency Addition
- 653,000 SF expansion to Florida’s eighth largest hospital.
- Phase I includes a parking garage and the Bixler Emergency Center.
- Phase II consists of a Family Care unit, Women’s and Children’s
Center and a professional office building.
- Threshold Inspector
TallahasseeCenter
- Addition of an 11 story residential condominium on top of an existing 4 story
underground parking garage.
- cast-in-place concrete columns, beams with two way flat slabs.
- Primary Structural Frame; cast-in-place concrete flat slab system supported
by concrete columns.
- The project was severely handicapped by the limitations of the existing garage
foundations which had been designed for only a 6 story office building.
- Project Manager, Engineer of Record
PlazaTower at KlemanPlaza
- New mixed use building with 2 floors of retail, 4 parking levels, 17 residential
levels, mechanical level and roof.
- The building is constructed with concrete augercast piles, pile caps, columns,
post tensioned flat slab, and transfer girders, with a structural steel roof
structure with steel beams, sloping open web steel joists and steel roof deck.
- The parking garage has two levels below grade with a concrete basement retaining
wall.
- Project Manager, Engineer of Record
The View Condominiums
- New 22 story condominium including two levels below grade. One residence
is located on each floor.
- Structure consists of deep augercast pile foundation and concrete pile caps,
concrete columns, post tensioned flat slabs.
- Project Manager, Engineer of Record
Gillette Stadium, Foxborough, Massachusetts
- 65,000 seat football stadium for the New England Patriots
- Primary structural frame, structural steel
- Project Engineer.
Heinz Field, Pittsburgh, Pennsylvania
- 65,000 seat football stadium for the Pittsburgh Steelers
- Primary structural frame, structural steel, including a 75 foot cantilevered
canopy
- Project Engineer
|
 |